Aquatics Facility
Hueneme High School

In collaboration with Arch-Pac Aquatics, the design of this high school aquatics facility utilized the compact site within existing campus buildings to create an arena-like atmosphere. The painted supergraphic elements in school colors visually tie the entire space together. The 34m by 25-yard rim-flow pool includes a dedicated dive area and two shallow lanes for teaching. A new aquatics support building houses locker and team rooms, coaches offices, restrooms, indoor and deck showers, and storage and mechanical areas. New stadium lighting and a new scoreboard provide a high-functioning competition venue. High-efficiency pool equipment provides significant energy savings and helps to reduce maintenance costs for the school.

  • Location

    Port Hueneme, CA

  • Services

    Architecture

  • Award

    Construction Management Association of America (CMAA) Southern California Chapter, Project Achievement Award

Aquatic Facility


Blackbird Team | Ken Radtkey, Mark Delgado, Adam Sharkey
Aquatic Designer | Arch-Pac Aquatics
Structural Engineer | T&S Structural
Mechanical Engineer | Turpin & Rattan Engineering, Inc.
Electrical Engineer | Alan Noelle Engineering
Civil Engineer | RBF Consulting
Contractor | SC Anderson, Inc.
Cost Estimator | C. P. O'Halloran Associates, Inc.