Aquatics Facility
Adolfo Camarillo High School

In collaboration with Arch-Pac Aquatics, the site planning of this new aquatic facility focused on showcasing dramatic views from the pool deck of the surrounding mountains. The facility houses a 34 meter by 25-yard rim-flow pool with a dedicated dive area, and the new aquatics support building features locker and team rooms, coaches’ offices, restrooms, indoor and deck showers, as well as storage and mechanical areas. New stadium lighting and a new scoreboard provide a high-functioning competition venue. Building design provided outdoor shower areas with ribbons of glazed concrete block highlighting school colors. High-efficiency pumps and filters provide significant energy savings and reduce maintenance costs.

Share:
Front-on view of a competitive lap pool featuring a dark masonry wall with "Scorpions Aquatics" signage.
Wide-angle view of an outdoor swimming complex with mountain silhouettes under a bright, cloudy sky.
Perspective view of a high school water polo and swim facility with blue and white tiled accents.
Close-up of numbered KDI Paragon diving boards along the edge of a bright blue swimming pool.
Exterior of an aquatic support building featuring tan brickwork, blue striped tiling, and industrial metal doors.


Blackbird Team | Ken Radtkey, Mark Delgado, Adam Sharkey
Aquatic Designer | Arch-Pac Aquatics
Structural Engineer | T&S Structural
Mechanical Engineer | Turpin & Rattan Engineering, Inc.
Electrical Engineer | Alan Noelle Engineering
Civil Engineer | RBF Consulting
Contractor | SC Anderson, Inc.
Cost Estimator | C. P. O'Halloran Associates, Inc.